Electrical substation

Construction and reconstruction of substations of all voltage classes.
EDS-Engineering has all the necessary permissions to carry out design, construction, commissioning, and commissioning of electrical substations with voltage classes from 10 to 330 kV.

Cable lines

Connection to networks and documentation services at all stages
EDS-Engineering specialists use modern methods that allow cable laying in trenches, tunnels, channels, and ducts.

Industrial solar power station

A full cycle of construction of industrial solar power stations
EDS-Engineering has been building solar power stations of any complexity. A professional approach to the construction of a power station will ensure the rapid construction and launch of a solar power station, including a high-powered one.

SPP for your personal needs

Construction of solar power plants for your personal needs for business
Electrical substations
Cable lines
Industrial solar power station
SPP for your personal needs

Advantage

Over 10 years of
experience in the construction of solar power stations and substations
2 500 projects
in the field of electricity and energy
3000 units
switchboard equipment under the trademark of EDS
500 company professionals
of the company, including temporarily attracted to objects
1st place
in the rating of designers of SPS according to the GetMarket investment platform
More than 900 MW
The total capacity of the designed SPS
More than 220 MW
photovoltaic capacities were built “from scratch” throughout Ukraine
4th place
in the rating of general contractors of SPS according to the GetMarket investment platform

EDS Engineering projects

The project is being built
Construction of substation 330/35 kV "Nadezhdino"
  • The substation will provide power supply to the future Zaporizhzhya wind farm with a capacity of 500 MW, which promises to become the largest in Ukraine.
The project is completed
Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka»
  • A set of works on the installation of equipment and specialized software (SCADA system) was completed, which provide the ability to receive and transmit information from the substation (SS) to the control center.
The project is completed
THE POWER SUPPLY OF LCD PIXEL
  • Provide supply facility switchboards 0,4 kV individual performance on a qualitative high-voltage equipment Eaton, including one of our flagship sales main switchboard 400A StreamLine.
 Reconstruction of the cable line «Lider»
The project is completed
Reconstruction of the cable line «Lider»
  • The length of the route : 2151 m
The project is being built
Installation of cable lines for wind farm "Sivash"
  • 150 km of cable lines;
  • 500 km of cable of XLPE;
  • 170 km of fiber-optic communication lines of a high degree of protection.
Construction of substation 330/35 kV
The project is being built
Construction of substation 330/35 kV "Nadezhdino"
PS construction
Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka»
The project is completed
Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka»
PS construction
THE POWER SUPPLY OF LCD PIXEL
The project is completed
THE POWER SUPPLY OF LCD PIXEL
Power Supply and Automation
 Reconstruction of the cable line «Lider»
The project is completed
Reconstruction of the cable line «Lider»
Installation of cable lines for wind farm
The project is being built
Installation of cable lines for wind farm "Sivash"
Cable Lines

Projects on the map

eds Engineering
Objects

Latest news