AEGAS- Terminal

Development of design documentation and performance of the whole range of works on electricity supply:

  • LPG automatic loading station.
  • Loading-unloading railway overpass.
  • Booster pump station.
  • Tank farm for LPG storage.
  • Nitrogen plant.
  • Construction of transformer substation TS-10/0.4 kV with a capacity of 2х630 kVA.
  • On-site utilities.
  • Outdoor electric lighting of territory and objects.
  • Lightning-protection and grounding.